Organic Resources Recovery Centre Phase 2 (O·PARK2)
2019 - Work in Progress
Project Name
Organic Resources Recovery Centre Phase 2 (O·PARK2)
Owner
Hong Kong Environmental Protection Department (EPD)
Architectural Overview
2019 - Work in Progress
Project Introduction
The O・PARK2, located in Sha Ling, North District, is a commercial and industrial organic waste recycling facility developed by the Hong Kong Environmental Protection Department as part of the plan to establish a food waste recycling network in Hong Kong, as part of the HKSAR Government’s waste management policy. A joint venture between CSHK and its partners has been awarded the design, construction and operation contract for O・PARK2, including a 15-year operation period. O・PARK2 will use anaerobic digestion technology to convert food waste into biogas for power generation and will process the treated residue into fertilizer.
C-SMARTFunctionality
1. DWSS
2. BIM
- 3D BIM Model
- 4D Construction Sequence
- 5D Cost Estimation