The project includes the construction of a 700m long section of the Central Kowloon Route main line at Kai Tak, the Kai Tak Interchange including bridges, tunnels and related ground connection roads to connect the Central Kowloon Route with the existing road network, and other related works. Congestion situation of road network in Central Kowloon. The estimated construction completion date is 2024.
C-SMARTFunctionality
1. DWSS
2. BIM
- 3D BIM Model
- 4D Construction Sequence
- 5D Cost Estimation
- Rebar Fabrication