{"code":1,"message":"查询成功","list":[{"id":28,"orderby":28,"cate_id":"2","pic":"\/upload\/images\/20240826\/aef1ffc01891bd49dbdac31f1af6b143.png","pic2":null,"name":"Lamma Power Station Extension Foundation Works for Unit 13","name2":"Lamma Power Station Extension Foundation Works for Unit 13","name3":"Extension Foundation Works","name4":"The Hongkong Electric Company, Limited (HK Electric)","name5":"2024 - 2024","jxname":"2024 - 2024","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack\n4. Safety Monitoring System using Artificial Intelligence","create_time":1724910142,"update_time":1735894927,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20240826\/02e53aa02151d966754ff087653fa3e4.jpg,\/upload\/images\/20240826\/aef1ffc01891bd49dbdac31f1af6b143.png,\/upload\/images\/20240826\/c66dcc5937ab67466f5d505d70109e2c.png","seo_title":"Lamma Power Station","seo_keywords":"Lamma Power Station","seo_description":"Lamma Power Station Extension Foundation Works for Unit 13","name_zh":"南丫岛发电厂扩建项目地基工程","name2_zh":"南丫岛发电厂扩建项目地基工程","name3_zh":"地基工程","name4_zh":"香港电灯有限公司","name5_zh":"2024 - 2024","jxname_zh":"2024 - 2024","desc_zh":"1. 中央管理平台\n2. 數字化追蹤系統\n3. 工地人員智能監測設備\n4. 不安全行爲監測系統 - 人工智能安全監測系統","seo_title_zh":"南丫島發電廠","seo_keywords_zh":"南丫島","seo_description_zh":"南丫島發電廠擴建項目地基工程","name_en":"Lamma Power Station Extension Foundation Works for Unit 13","name2_en":"Lamma Power Station Extension Foundation Works for Unit 13","name3_en":"Extension Foundation Works","name4_en":"The Hongkong Electric Company, Limited (HK Electric)","name5_en":"2024 - 2024","jxname_en":"2024 - 2024","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack\n4. Safety Monitoring System using Artificial Intelligence","seo_title_en":"Lamma Power Station","seo_keywords_en":"Lamma Power Station","seo_description_en":"Lamma Power Station Extension Foundation Works for Unit 13"},{"id":27,"orderby":27,"cate_id":"1,2","pic":"\/upload\/images\/20231201\/80b3c816f27e2aa958bc9400abded521.jpg","pic2":null,"name":"Yuen Long Barrage and Nullah Improvement Schemes","name2":"Yuen Long Barrage and Nullah Improvement Schemes","name3":"The scope of the project comprises:\n(a) provision of a barrage scheme in Yuen Long including the construction of an automatic flood barrier of about 60m, a stormwater pumping station, a master control centre and the associated electrical and mechanical facilities in the Yuen Long Nullah; (b) modification of about 300 m of the Yuen Long Nullah and drainage improvement works at the intersection of the Yuen Long Nullah and the Yuen Long Bypass Floodway; (c) construction of drainage channels of about 200 m; (d) improvement of flood walls of about 3.2km along the Kam Tin River and construction of flood walls of about 0.8 km along the Yuen Long Nullah and the Sham Chung River; (e) revitalisation of a section of about 1 km of the Yuen Long Nullah between the Long Ping Station and the location of the proposed barrage; and (f) carrying out ancillary works","name4":"Hong Kong Drainage Services Department (DSD)","name5":"2023 - Work in Progress (Total construction area of 229,800 sqm)","jxname":"2023 - Work in Progress (Total construction area of 229,800 sqm)","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone\n5. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack\n6. Safety Monitoring System using Artificial Intelligence","create_time":1701396857,"update_time":1735894900,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/80b3c816f27e2aa958bc9400abded521.jpg,\/upload\/images\/20231201\/04d75d3ce398c15334b141c3fbf40474.jpg","seo_title":"Yuen Long Barrage and Nullah Improvement Schemes","seo_keywords":"Yuen Long Barrage and Nullah Improvement Schemes","seo_description":"Yuen Long Barrage and Nullah Improvement Schemes","name_zh":"元朗防洪坝及明渠改善计划","name2_zh":"元朗防洪坝及明渠改善计划","name3_zh":"工程项目范围包括:(a) 在元朗推展防洪坝计划,包括在元朗明渠建造长约60 米的自动防洪屏障、雨水泵房、总控制中心及相关机电设施;(b) 改建长约300米的元朗明渠及在元朗明渠与元朗排水绕道交汇处进行雨水排放系统改善工程;(c) 建造长约200 米的排水道;(d) 在锦田河改善长约3.2 公里的防洪墙及在元朗明渠及深涌河建造长约0.8 公里的防洪墙;(e) 活化一段长约1 公里位于朗屏站至拟议防洪坝位置的元朗明渠;(f) 以及进行相关附属工程。","name4_zh":"香港渠务署","name5_zh":"2023 - 工程进行中(总建筑面积 229,800 平方米)","jxname_zh":"2023 - 工程进行中(总建筑面积 229,800 平方米)","desc_zh":"1.中央管理平台\n2.數字化追蹤系統\n3.數碼化工作許可證系統\n4.移動機械設備管理\n5.工地人員智能監控測設備\n6.不安全行爲監測系統 - 人工智能安全監測系統","seo_title_zh":"元朗防洪坝及明渠改善计划","seo_keywords_zh":"元朗防洪坝及明渠改善计划","seo_description_zh":"元朗防洪坝及明渠改善计划","name_en":"Yuen Long Barrage and Nullah Improvement Schemes","name2_en":"Yuen Long Barrage and Nullah Improvement Schemes","name3_en":"The scope of the project comprises:\n(a) provision of a barrage scheme in Yuen Long including the construction of an automatic flood barrier of about 60m, a stormwater pumping station, a master control centre and the associated electrical and mechanical facilities in the Yuen Long Nullah; (b) modification of about 300 m of the Yuen Long Nullah and drainage improvement works at the intersection of the Yuen Long Nullah and the Yuen Long Bypass Floodway; (c) construction of drainage channels of about 200 m; (d) improvement of flood walls of about 3.2km along the Kam Tin River and construction of flood walls of about 0.8 km along the Yuen Long Nullah and the Sham Chung River; (e) revitalisation of a section of about 1 km of the Yuen Long Nullah between the Long Ping Station and the location of the proposed barrage; and (f) carrying out ancillary works","name4_en":"Hong Kong Drainage Services Department (DSD)","name5_en":"2023 - Work in Progress (Total construction area of 229,800 sqm)","jxname_en":"2023 - Work in Progress (Total construction area of 229,800 sqm)","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone\n5. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack\n6. Safety Monitoring System using Artificial Intelligence","seo_title_en":"Yuen Long Barrage and Nullah Improvement Schemes","seo_keywords_en":"Yuen Long Barrage and Nullah Improvement Schemes","seo_description_en":"Yuen Long Barrage and Nullah Improvement Schemes"},{"id":26,"orderby":26,"cate_id":"2,4","pic":"\/upload\/images\/20231201\/6091f197acab0503009e0e66d5319a55.jpg","pic2":null,"name":"Public Housing Development at Wang Chiu Road Phase 1","name2":"Public Housing Development at Wang Chiu Road Phase 1","name3":"Construction of three non-standard residential buildings (Block One, Block Two and Block Three) comprising: A 39-storey non-standard residential building with Mutual Aid Committee Offices (MAC) and a study room and welfare facilities on the ground floor. Two 35-storey non-standard residential buildings with three ground-level podium levels and one basement level. Three 36-storey non-standard residential buildings with basement and open-air parking on the first floor, table tennis and badminton courts and basketball courts on the first floor, covered walkways, plantations and public play areas on the second floor.","name4":"Hong Kong Housing Authority","name5":"2022 - Work in Progress (Total construction area of 17,100 sqm)","jxname":"2022 - Work in Progress (Total construction area of 17,100 sqm)","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Hazardous area access control by Electronic Lock & Key System\n5. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone \n6. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone \n7. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack\n8. AI Safety Monitoring System\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","create_time":1701396754,"update_time":1735894980,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/6091f197acab0503009e0e66d5319a55.jpg,\/upload\/images\/20231201\/babbce9df0c6259d67d61f188f398d21.jpg","seo_title":"Public Housing Development at Wang Chiu Road Phase 1","seo_keywords":"Public Housing Development at Wang Chiu Road Phase 1","seo_description":"Public Housing Development at Wang Chiu Road Phase 1","name_zh":"宏照道第一期公屋发展计划","name2_zh":"宏照道第一期公屋发展计划","name3_zh":"建造三座非标准住宅楼宇(一座、二座及三座),包括:一座 39 层非标准住宅楼宇,在底层设有互助委员会办公室 (MAC) 和一间自习室及福利设施。二座 35 层非标准住宅楼宇,地面三层平台层及一层地牢。三座 36 层非标准住宅楼宇,包括一层地下停车场和一楼的露天停车场、一楼的乒乓球场和羽毛球场以及篮球场、二楼的有盖人行道、种植园和公共游乐区。","name4_zh":"香港房屋委员会","name5_zh":"2022 - 工程进行中(总建筑面积17,100平方米)","jxname_zh":"2022 - 工程进行中(总建筑面积17,100平方米)","desc_zh":"1. 中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統\n4. 電子鎖系統\n5. 移動機械設備管理\n6. 天秤起重安全管理系統\n7. 工地人員智能監測設備\n8. 不安全行爲監測系統 - 人工智能安全監測系統\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_zh":"宏照道第一期公屋发展计划","seo_keywords_zh":"宏照道第一期公屋发展计划","seo_description_zh":"宏照道第一期公屋发展计划","name_en":"Public Housing Development at Wang Chiu Road Phase 1","name2_en":"Public Housing Development at Wang Chiu Road Phase 1","name3_en":"Construction of three non-standard residential buildings (Block One, Block Two and Block Three) comprising: A 39-storey non-standard residential building with Mutual Aid Committee Offices (MAC) and a study room and welfare facilities on the ground floor. Two 35-storey non-standard residential buildings with three ground-level podium levels and one basement level. Three 36-storey non-standard residential buildings with basement and open-air parking on the first floor, table tennis and badminton courts and basketball courts on the first floor, covered walkways, plantations and public play areas on the second floor.","name4_en":"Hong Kong Housing Authority","name5_en":"2022 - Work in Progress (Total construction area of 17,100 sqm)","jxname_en":"2022 - Work in Progress (Total construction area of 17,100 sqm)","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Hazardous area access control by Electronic Lock & Key System\n5. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone \n6. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone \n7. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack\n8. AI Safety Monitoring System\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_en":"Public Housing Development at Wang Chiu Road Phase 1","seo_keywords_en":"Public Housing Development at Wang Chiu Road Phase 1","seo_description_en":"Public Housing Development at Wang Chiu Road Phase 1"},{"id":25,"orderby":25,"cate_id":"2,4","pic":"\/upload\/images\/20231201\/e208559ed86656e203e30f3008191955.jpg","pic2":null,"name":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","name2":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","name3":"The preparatory works for Phase 2 (Stage 1) of the Prince of Wales Hospital redevelopment project commenced in 2017, while the demolition and foundation works commenced in December 2019 and are in progress. The new inpatient wing building is approximately 297,950 square meters.","name4":"Hong Kong Hospital Authority (HA)","name5":"2023 - Work in Progress","jxname":"2023 - Work in Progress","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Hazardous area access control by Electronic Lock & Key System\n5. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone\n6. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n7. Worker Location and Health Monitoring System - SmartTrack\n8. Safety Monitoring System using Artificial Intelligence\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","create_time":1701396651,"update_time":1735894495,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/e208559ed86656e203e30f3008191955.jpg,\/upload\/images\/20231201\/cb0dd6af7b77b3a318c3a24cd1cfb736.jpg","seo_title":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","seo_keywords":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","seo_description":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","name_zh":"威尔斯亲王医院重建计划第二期(第一阶段)","name2_zh":"威尔斯亲王医院重建计划第二期(第一阶段)","name3_zh":"威尔斯亲王医院重建计划第二期(第一阶段)的筹备工程已在 2017 年开展,而拆卸及地基工程工程亦已于 2019 年 12 月展开并在进行中。住院新翼大楼约 297,950 平方米。","name4_zh":"香港医院管理局","name5_zh":"2023 - 工程进行中","jxname_zh":"2023 - 工程进行中","desc_zh":"1. 中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統\n4. 電子鎖系統\n5. 移動機械設備管理\n6. 天秤起重安全管理系統\n7. 工地人員智能監測設備\n8. 不安全行爲監測系統 - 人工智能安全監測系統\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_zh":"威尔斯亲王医院重建计划第二期(第一阶段)","seo_keywords_zh":"威尔斯亲王医院重建计划第二期(第一阶段)","seo_description_zh":"威尔斯亲王医院重建计划第二期(第一阶段)","name_en":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","name2_en":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","name3_en":"The preparatory works for Phase 2 (Stage 1) of the Prince of Wales Hospital redevelopment project commenced in 2017, while the demolition and foundation works commenced in December 2019 and are in progress. The new inpatient wing building is approximately 297,950 square meters.","name4_en":"Hong Kong Hospital Authority (HA)","name5_en":"2023 - Work in Progress","jxname_en":"2023 - Work in Progress","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Hazardous area access control by Electronic Lock & Key System\n5. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone\n6. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n7. Worker Location and Health Monitoring System - SmartTrack\n8. Safety Monitoring System using Artificial Intelligence\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_en":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","seo_keywords_en":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)","seo_description_en":"Redevelopment of Prince of Wales Hospital Phase II (Stage I)"},{"id":24,"orderby":24,"cate_id":"2,4","pic":"\/upload\/images\/20231201\/431711b2ccf3ac406bc1114526110170.jpg","pic2":null,"name":"Relocation of Sha Tin Sewage Treatment Works to Caverns - Main Caverns Construction and Upstream Sewerage Works","name2":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","name3":"The main cavern complex of the Shatin Cavern Sewage Treatment Plant covers an area of ​​approximately 14 hectares and has a total volume of approximately 2.3 million cubic meters. The major scope of works includes: (a) construction of two ventilation buildings and other associated buildings; (b) construction and installation of cavern ventilation system and associated electrical system; (c) construction of emergency drainage pipeline; (d) carrying out other associated works; and Implement environmental mitigation measures and related environmental monitoring and audit plans for the above projects. Construction work began in 2018 and is expected to take 11 years to complete.","name4":"Hong Kong Drainage Services Department","name5":"2021 - Work in Progress","jxname":"2021 - Work in Progress","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Hazardous area access control by Electronic Lock & Key System\n5. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone \n6. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n7. Safety Monitoring System using Artificial Intelligence\n8. Confined Space monitoring system-worker counting and Location Tracking System\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation","create_time":1701396518,"update_time":1735890422,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/431711b2ccf3ac406bc1114526110170.jpg,\/upload\/images\/20231201\/b7319ff7b7624d1a0ee3e19d415426fc.jpg","seo_title":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","seo_keywords":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","seo_description":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","name_zh":"搬迁沙田污水处理厂往岩洞 - 主体岩洞建造工程","name2_zh":"搬迁沙田污水处理厂往岩洞 - 主体岩洞建造工程","name3_zh":"沙田岩洞污水处理厂面积约 14 公顷、总体积约 230 万立方米的主体岩洞建筑群。主要工程范围包括:(a) 兴建两座通风大楼及其他相关建筑物;(b) 兴建及安装岩洞通风系统及相关电气系统;(c) 兴建紧急排放管道;(d) 进行其他相关工程;以及就上述工程实施缓解环境影响措施和相关的环境监察及审核计划。建筑工程在 2018 年动工,预计前后会花 11 年时间才会完成。","name4_zh":"香港渠务署","name5_zh":"2021 - 工程进行中","jxname_zh":"2021 - 工程进行中","desc_zh":"1. 中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統\n4. 電子鎖系統\n5. 移動機械設備管理\n6. 天秤起重安全管理系統\n7. 不安全行爲監測系統 - 人工智能安全監測系統\n8. 密閉空間監測系統\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation","seo_title_zh":"搬迁沙田污水处理厂往岩洞-主体岩洞建造工程","seo_keywords_zh":"搬迁沙田污水处理厂往岩洞-主体岩洞建造工程","seo_description_zh":"搬迁沙田污水处理厂往岩洞-主体岩洞建造工程","name_en":"Relocation of Sha Tin Sewage Treatment Works to Caverns - Main Caverns Construction and Upstream Sewerage Works","name2_en":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","name3_en":"The main cavern complex of the Shatin Cavern Sewage Treatment Plant covers an area of ​​approximately 14 hectares and has a total volume of approximately 2.3 million cubic meters. The major scope of works includes: (a) construction of two ventilation buildings and other associated buildings; (b) construction and installation of cavern ventilation system and associated electrical system; (c) construction of emergency drainage pipeline; (d) carrying out other associated works; and Implement environmental mitigation measures and related environmental monitoring and audit plans for the above projects. Construction work began in 2018 and is expected to take 11 years to complete.","name4_en":"Hong Kong Drainage Services Department","name5_en":"2021 - Work in Progress","jxname_en":"2021 - Work in Progress","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Hazardous area access control by Electronic Lock & Key System\n5. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone \n6. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n7. Safety Monitoring System using Artificial Intelligence\n8. Confined Space monitoring system-worker counting and Location Tracking System\n9. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation","seo_title_en":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","seo_keywords_en":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works","seo_description_en":"Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction and Upstream Sewerage Works"},{"id":23,"orderby":23,"cate_id":"2,3","pic":"\/upload\/images\/20231201\/53a1b871327b98359418702595554940.jpg","pic2":null,"name":"West Rail Kam Sheung Road Station Package 1 Property Development","name2":"West Rail Kam Sheung Road Station Package 1 Property Development","name3":"Road works near the West Rail Kam Sheung Road Station Phase 1 Property Development Project: (a) Proposed construction of a temporary public transport interchange and temporary park-and-ride facilities, and closure and demolition of the existing public transport interchange and existing park-and-ride facilities; (b) relocate the permanent public transport interchange and permanent park-and-ride facilities and, upon completion of the permanent facilities, close and demolish the temporary public transport interchange and temporary park-and-ride facilities; (c) relocate the existing There are public bicycle parking spaces and other transportation facilities. (d) improvement of the above junction and modification of the relevant carriageway, footpath and roadside strip; ancillary works to the above road works; (e) modification and stabilisation of slopes, Construction of retaining walls, pedestrian crossing facilities, vehicular access routes, associated utilities and restoration works. The project has a construction area of ​​approximately 114,800 sqm and provides approximately 1,650 units.","name4":"Sino Group, China Overseas Real Estate, Ka Wah International","name5":"2016 - Work in Progress","jxname":"2016 - Work in Progress","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n5. Safety Monitoring System using Artificial Intelligence\n6. Confined Space monitoring system-worker counting and Location Tracking System\n7. DWSS","create_time":1701395967,"update_time":1735889637,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/53a1b871327b98359418702595554940.jpg,\/upload\/images\/20231201\/bedf4fe26c7c1a12e7be78c6ddf27e3f.jpg","seo_title":"West Rail Kam Sheung Road Station Package 1 Property Development","seo_keywords":"West Rail Kam Sheung Road Station Package 1 Property Development","seo_description":"West Rail Kam Sheung Road Station Package 1 Property Development","name_zh":"西铁锦上路站第一期物业发展项目","name2_zh":"西铁锦上路站第一期物业发展项目","name3_zh":"邻近西铁锦上路站第一期物业发展项目的道路工程:(a) 拟建临时公共运输交汇处及临时泊车转乘设施,并封闭及拆卸现有共运输交汇处及现有泊车转乘设施;(b) 重新设置永久公共运输交汇处及永久泊车转乘设施,并在永久设施落成后,封闭及拆卸上述临时公共运输交汇处及临时泊车转乘设施;(c) 迁移现有公共单车停放处和其他交通设施。锦田公路/青朗公路支路的交界处的道路;(d) 改善上述交界处及修改相关行车道、行人路及路旁带;上述道路工程的附属工程,(e) 修改及稳固斜坡、兴建挡土墙、行人过路设施、车辆出入通道、相关公用设施和修复工程。该项目建筑面积约 114,800 平方米,提供约 1650 个单位。","name4_zh":"信和集团、中海地产、嘉华国际","name5_zh":"2016 - 工程进行中","jxname_zh":"2016 - 工程进行中","desc_zh":"1. 安全中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統\n4. 天秤起重安全管理系統\n5. 不安全行爲監測系統 - 人工智能安全監測系統\n6. 密閉空間監測系統\n7. DWSS","seo_title_zh":"西铁锦上路站第一期物业发展项目","seo_keywords_zh":"西铁锦上路站第一期物业发展项目","seo_description_zh":"西铁锦上路站第一期物业发展项目","name_en":"West Rail Kam Sheung Road Station Package 1 Property Development","name2_en":"West Rail Kam Sheung Road Station Package 1 Property Development","name3_en":"Road works near the West Rail Kam Sheung Road Station Phase 1 Property Development Project: (a) Proposed construction of a temporary public transport interchange and temporary park-and-ride facilities, and closure and demolition of the existing public transport interchange and existing park-and-ride facilities; (b) relocate the permanent public transport interchange and permanent park-and-ride facilities and, upon completion of the permanent facilities, close and demolish the temporary public transport interchange and temporary park-and-ride facilities; (c) relocate the existing There are public bicycle parking spaces and other transportation facilities. (d) improvement of the above junction and modification of the relevant carriageway, footpath and roadside strip; ancillary works to the above road works; (e) modification and stabilisation of slopes, Construction of retaining walls, pedestrian crossing facilities, vehicular access routes, associated utilities and restoration works. The project has a construction area of ​​approximately 114,800 sqm and provides approximately 1,650 units.","name4_en":"Sino Group, China Overseas Real Estate, Ka Wah International","name5_en":"2016 - Work in Progress","jxname_en":"2016 - Work in Progress","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n5. Safety Monitoring System using Artificial Intelligence\n6. Confined Space monitoring system-worker counting and Location Tracking System\n7. DWSS","seo_title_en":"West Rail Kam Sheung Road Station Package 1 Property Development","seo_keywords_en":"West Rail Kam Sheung Road Station Package 1 Property Development","seo_description_en":"West Rail Kam Sheung Road Station Package 1 Property Development"},{"id":22,"orderby":22,"cate_id":"1,2,3","pic":"\/upload\/images\/20231201\/9812e9774b7a4809c679dd4473265b8a.jpg","pic2":null,"name":"Phase 1A Main Contract Development Project of Hong Kong and Shenzhen Innovation and Technology Park","name2":"Phase 1A Main Contract Development Project of Hong Kong and Shenzhen Innovation and Technology Park","name3":"The construction of an Innovation and Technology Park in Hetao District, Lok Ma Chau, Hong Kong will become a key research cooperation base and provide related higher education, cultural creativity, and other supporting facilities, attracting top local and global enterprises, research and development institutions, and higher education institutions to settle in, bringing unprecedented development space and opportunities for Hong Kong's innovation and technology.","name4":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","name5":"2023 - Work in Progress","jxname":"2023 - Work in Progress","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone \n5. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n6. Safety Monitoring System using Artificial Intelligence","create_time":1701394970,"update_time":1735895034,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/9812e9774b7a4809c679dd4473265b8a.jpg,\/upload\/images\/20231201\/23910df6bd3ac0654331f27fbb9d268f.jpg","seo_title":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","seo_keywords":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","seo_description":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","name_zh":"港深创新及科技园之 1A 阶段主合约发展项目","name2_zh":"港深创新及科技园之 1A 阶段主合约发展项目","name3_zh":"于香港落马洲河套区兴建创新科技园,将成为重点科研合作基地,并会提供相关高等教育、文化创意和其他配套设施,吸引本地及来自世界各地的顶尖企业、研发机构和高等院校进驻,为香港创科带来前所未有的发展空间和机遇。","name4_zh":"港深创新及科技园(创科园)","name5_zh":"2023 - 工程进行中","jxname_zh":"2023 - 工程进行中","desc_zh":"1. 安全中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統\n4. 移動機械設備管理 \n5. 天秤起重安全管理系統\n6. 不安全行爲監測系統 - 人工智能安全監測系統\n7. DWSS","seo_title_zh":"港深创新及科技园(创科园)","seo_keywords_zh":"港深创新及科技园(创科园)","seo_description_zh":"港深创新及科技园(创科园)","name_en":"Phase 1A Main Contract Development Project of Hong Kong and Shenzhen Innovation and Technology Park","name2_en":"Phase 1A Main Contract Development Project of Hong Kong and Shenzhen Innovation and Technology Park","name3_en":"The construction of an Innovation and Technology Park in Hetao District, Lok Ma Chau, Hong Kong will become a key research cooperation base and provide related higher education, cultural creativity, and other supporting facilities, attracting top local and global enterprises, research and development institutions, and higher education institutions to settle in, bringing unprecedented development space and opportunities for Hong Kong's innovation and technology.","name4_en":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","name5_en":"2023 - Work in Progress","jxname_en":"2023 - Work in Progress","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone \n5. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone\n6. Safety Monitoring System using Artificial Intelligence","seo_title_en":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","seo_keywords_en":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)","seo_description_en":"Hong Kong-Shenzhen Innovation and Technology Park (HSITP)"},{"id":8,"orderby":20,"cate_id":"1,2","pic":"\/upload\/images\/20231104\/9ce9be31e3e795f38e7ae0aeae9c83e3.png","pic2":"\/static\/zhongjxg\/images\/qmty1.png","name":"New Acute Hospital at Kai Tak Development Area","name2":"New Acute Hospital at Kai Tak Development Area","name3":"The project is situated on Shing Cheong Road in Kai Tak, Kowloon City, Hong Kong. It stands as the sole new hospital endeavor within the government's comprehensive hospital development blueprint for the forthcoming decade.","name4":"Hong Kong Hospital Authority (HA)","name5":"2022 - Work in Progress (Total construction area of approximately 156,227 square meters)","jxname":"2022 - Work in Progress (Total construction area of approximately 156,227 square meters)","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone\n5. AI Safety Monitoring System\n6. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","create_time":1698812805,"update_time":1735896153,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/e0073e0e47ef2cf4c582191a48085ab2.jpg,\/upload\/images\/20231201\/54d96512c503201cf8765489242bedff.jpg","seo_title":"New Acute Hospital at Kai Tak Development Area","seo_keywords":"New Acute Hospital at Kai Tak Development Area","seo_description":"New Acute Hospital at Kai Tak Development Area","name_zh":"启德新急症医院","name2_zh":"启德新急症医院","name3_zh":"项目位于香港九龙城区启德承昌道,为政府未来十年医院发展计划中唯一新建的医院工程。","name4_zh":"香港医院管理局","name5_zh":"2022 - 工程进行中(总建筑面积约156,227平方米)","jxname_zh":"2022 - 工程进行中(总建筑面积约156,227平方米)","desc_zh":"1. 中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統\n4. 移動機械設備管理\n5. 不安全行爲監測系統 - 人工智能安全監測系統\n6. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_zh":"启德新急症医院","seo_keywords_zh":"启德新急症医院","seo_description_zh":"启德新急症医院","name_en":"New Acute Hospital at Kai Tak Development Area","name2_en":"New Acute Hospital at Kai Tak Development Area","name3_en":"The project is situated on Shing Cheong Road in Kai Tak, Kowloon City, Hong Kong. It stands as the sole new hospital endeavor within the government's comprehensive hospital development blueprint for the forthcoming decade.","name4_en":"Hong Kong Hospital Authority (HA)","name5_en":"2022 - Work in Progress (Total construction area of approximately 156,227 square meters)","jxname_en":"2022 - Work in Progress (Total construction area of approximately 156,227 square meters)","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert - Mobile Plant Operation Danger Zone\n5. AI Safety Monitoring System\n6. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_en":"New Acute Hospital at Kai Tak Development Area","seo_keywords_en":"New Acute Hospital at Kai Tak Development Area","seo_description_en":"New Acute Hospital at Kai Tak Development Area"},{"id":7,"orderby":19,"cate_id":"1,2,3,4","pic":"\/upload\/images\/20231201\/338270ef127b1fe7b2ce33d44f362309.jpg","pic2":"\/static\/zhongjxg\/images\/qmty8.png","name":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","name2":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","name3":"The project is located on Park Shing Kok Road in Tseung Kwan O, Hong Kong. It is the first traditional Chinese medicine hospital in Hong Kong, integrating multiple functions such as medical services, scientific research and teaching, and international exchanges.","name4":"Hong Kong Architectural Services Department (ASD)","name5":"2023 - Work in Progress","jxname":"2023 - Work in Progress","desc":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone \n5. Safety Monitoring System using Artificial Intelligence\n6. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","create_time":1698812805,"update_time":1735896098,"agent_id":1,"merchant_id":null,"pics2":"\/upload\/images\/20231201\/338270ef127b1fe7b2ce33d44f362309.jpg,\/upload\/images\/20231201\/823d0d963b833031a36c37347f8d5da8.jpg","seo_title":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","seo_keywords":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","seo_description":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","name_zh":"将军澳中医医院及政府中药检测中心","name2_zh":"将军澳中医医院及政府中药检测中心","name3_zh":"项目位于香港将军澳百胜角路,是香港首间中医医院,集医疗服务、科研教学、国际交流等多重功能于一身。","name4_zh":"香港建筑署","name5_zh":"2023 - 工程进行中","jxname_zh":"2023 - 工程进行中","desc_zh":"1. 中央管理平台\n2. 數字化追蹤系統\n3. 數碼化工作許可證系統 \n4. 天秤起重安全管理系統\n5. 不安全行爲監測系統 - 人工智能安全監測系統\n6. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_zh":"将军澳中医医院及政府中药检测中心","seo_keywords_zh":"将军澳中医医院及政府中药检测中心","seo_description_zh":"将军澳中医医院及政府中药检测中心","name_en":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","name2_en":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","name3_en":"The project is located on Park Shing Kok Road in Tseung Kwan O, Hong Kong. It is the first traditional Chinese medicine hospital in Hong Kong, integrating multiple functions such as medical services, scientific research and teaching, and international exchanges.","name4_en":"Hong Kong Architectural Services Department (ASD)","name5_en":"2023 - Work in Progress","jxname_en":"2023 - Work in Progress","desc_en":"1. Centralized Management Platform\n2. Digitized Tracking System of Site Plants, Powered tools and Ladders\n3. Digitalized Permit-to-work System (E-Permit)\n4. Unsafe Acts \/ Dangerous Situation Alert –Tower Crane Lifting Zone \n5. Safety Monitoring System using Artificial Intelligence\n6. BIM\n- 3D BIM Model\n- 4D Construction Sequence\n- 5D Cost Estimation\n- 8D Scan to BIM","seo_title_en":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","seo_keywords_en":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute","seo_description_en":"Tseung Kwan O Chinese Medicine Hospital and Government Chinese Medicines Testing Institute"}],"pages":[{"key":1,"val":"javascript:void(0);","cur":1,"page":1},{"key":2,"val":"\/index.php?page=2","cur":"","page":2},{"key":3,"val":"\/index.php?page=3","cur":"","page":3},{"key":">","val":"\/index.php?page=2","cur":"","page":2}]}