Widening of Fanling Highway from Tai Hang to Wo Hop Shek Interchange
2013 - 2018
Project Name
Widening of Fanling Highway from Tai Hang to Wo Hop Shek Interchange
Owner
Hong Kong Highways Department
Architectural Overview
2013 - 2018
Project Introduction
(a) Widening of the section of about 2 km long Fanling Highway between Tai Hang and Wo Hop Shek Interchange from a dual three-lane carriageway to a dual four-lane carriageway, with standard hard shoulders on both directions of the carriageway. (b) Widening of about 250m slip road connecting Jockey Club Road to the southbound of Fanling Highway at Wo Hop Shek. (c) Re-alignment of a section of 1.2 km long Tai Wo Service Road West between Tai Hang and Nam Wa Po. (d) Construction of a vehicular bridge with footway at Kau Lung Hang, demolition of four existing footbridges and construction of four footbridges at Tai Hang, Tai Wo, Ho Ka Yuen and Wo Hop Shek; and (e) Construction of associated noise barriers, at-grade link roads and access tracks, footpaths and cycle tracks. (f) Associated slope works, road lighting, traffic aids, drainage, water-mains, landscaping, electrical and mechanical works.