Public Housing Development at Wang Chiu Road Phase 1

2022 - Work in Progress (Total construction area of 17,100 sqm)
  • Public Housing Development at Wang Chiu Road Phase 1
  • Public Housing Development at Wang Chiu Road Phase 1
  • Project Name

    Public Housing Development at Wang Chiu Road Phase 1
  • Owner

    Hong Kong Housing Authority
  • Architectural Overview

    2022 - Work in Progress (Total construction area of 17,100 sqm)
  • Project Introduction

    Construction of three non-standard residential buildings (Block One, Block Two and Block Three) comprising: A 39-storey non-standard residential building with Mutual Aid Committee Offices (MAC) and a study room and welfare facilities on the ground floor. Two 35-storey non-standard residential buildings with three ground-level podium levels and one basement level. Three 36-storey non-standard residential buildings with basement and open-air parking on the first floor, table tennis and badminton courts and basketball courts on the first floor, covered walkways, plantations and public play areas on the second floor.
  • C-SMARTFunctionality

    1. Centralized Management Platform 2. Digitized Tracking System of Site Plants, Powered tools and Ladders 3. Digitalized Permit-to-work System (E-Permit) 4. Hazardous area access control by Electronic Lock & Key System 5. Unsafe Acts / Dangerous Situation Alert - Mobile Plant Operation Danger Zone 6. Unsafe Acts / Dangerous Situation Alert –Tower Crane Lifting Zone 7. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack 8. AI Safety Monitoring System 9. BIM - 3D BIM Model - 4D Construction Sequence - 5D Cost Estimation - 8D Scan to BIM