Public Housing Development at Wang Chiu Road Phase 1
2022 - Work in Progress (Total construction area of 17,100 sqm)
Project Name
Public Housing Development at Wang Chiu Road Phase 1
Owner
Hong Kong Housing Authority
Architectural Overview
2022 - Work in Progress (Total construction area of 17,100 sqm)
Project Introduction
Construction of three non-standard residential buildings (Block One, Block Two and Block Three) comprising: A 39-storey non-standard residential building with Mutual Aid Committee Offices (MAC) and a study room and welfare facilities on the ground floor. Two 35-storey non-standard residential buildings with three ground-level podium levels and one basement level. Three 36-storey non-standard residential buildings with basement and open-air parking on the first floor, table tennis and badminton courts and basketball courts on the first floor, covered walkways, plantations and public play areas on the second floor.
C-SMARTFunctionality
1. Centralized Management Platform
2. Digitized Tracking System of Site Plants, Powered tools and Ladders
3. Digitalized Permit-to-work System (E-Permit)
4. Hazardous area access control by Electronic Lock & Key System
5. Unsafe Acts / Dangerous Situation Alert - Mobile Plant Operation Danger Zone
6. Unsafe Acts / Dangerous Situation Alert –Tower Crane Lifting Zone
7. Smart Monitoring Devices for Workers and Frontline Site Personnel - SmartTrack
8. AI Safety Monitoring System
9. BIM
- 3D BIM Model
- 4D Construction Sequence
- 5D Cost Estimation
- 8D Scan to BIM